The e2e test configuration has been modified to take screenshots only on failure and the dev server code has been adjusted for better project directory handling. The "supabase:reset" command in package.json no longer starts the server after reset. Default roles 'owner' and 'member' are also now seeded into the roles table, and constraints in the roles table and its associated functions have been updated to manage hierarchy levels and role naming more effectively.
Updated the Playwright End-To-End test configurations to run the local dev server before starting the tests. Removed unnecessary page load wait states in the invitation tests. Also, updated the parameters passed in the `visitMailbox` method used in the authentication tests.
This commit adds data testing attributes to key elements in the team account invitations features. It also modifies e2e tests to make use of these attributes. Additionally, it introduces minor tweaks to other parts of the system to better facilitate testing, such as adjustments in timeouts and update of some log messages.
Multiple updates are made to refine the account management features, including updating the 'Your Teams' text to show the number of teams, and modifying the form data validation process in the 'deletePersonalAccountAction' service. Additionally, improvements have been made in test configurations including updating the test timeout settings, taking screenshots when a test fails, and adjusting the location for saving Playwright reports.
Adjusted the parallel test limit on CI from 1 to 2 in playwright configuration and updated the test script to stop after the first failure. These changes will allow CI to run tests more efficiently and stop running further tests when a failure is encountered.
This update changes the number of retries in the Playwright configuration. Additionally, solid improvements have been made in the account settings, including better data semantics for testing, changes to email confirmation, and adding a new E2E test suite for accounts. The sign-up flow was updated and problems with multi-language support logic were fixed.
The commit introduces Playwright configuration for End-to-End testing and modifies several files to optimize the project's structure. It also modifies the middleware to interact with Next.js and fix URL creation. Changes in database types were made to refine their structure.